Religious Schools/Education Facilities
<Schools
Parkway Christian Church;
Located in Surprise, Phase I of this project consisted of a 12,000 sf multi-purpose structure providing 5,400 sf of worship space and an additional 6,600 sf of office and classroom area. Construction was completed on phase I in 2004. Phase II is a new 42,000 sf 2 story multi-purpose building. The structure provides seating for 1,400 people in 2 seperate worship areas, with a seperate 2,000 sf youth are. The second floor mezzanine houses 8,000 sf of meeting and office areas.
Both phases utilized concrete tilt up panel/ steel roof construction. Phase II was completed in 2010, with a contruction cost of $6.5M
St. Theresa’s Catholic School;
A new Early Childhood Learning Center is designed for approximately 16,000 sq. ft. and will be completed in 2010 for a total of $2.5M.
St. Simon & Jude Catholic School;
Campus addition consists of a 24,000 sq. ft. two-story Classroom Building attached to a New Gymnasium. A total project cost is $3M, and is scheduled for completion in 2010.
St. Francis Xavier School and Faith Education Center;
Phase 1A Campus addition consists of a 34,000 sq. ft. two-story Classroom Building attached to a New Gymnasium. A total project cost is $6.5M, and is scheduled for completion in 2010.
Temple Kol Ami;
A 14,000 sq. ft. Classroom Building was completed in 1993 in Phoenix, AZ. Will Bruder Architect.
St. John Vianney Elementary School;
Located in Avondale, A New school Campus added to existing Church property and consisted of a two-story, 29,000 sq. ft. Classroom Building. Also constructed was a 7000 sq. ft. single story administration building. Construction completed in 1997.
Pope John XXIII Regional Elementary School;
Located in Phoenix, a two-story, 30,000 sq. ft. classroom/administration building was completed. Also constructed was a 15,000 sq. ft. classroom building that was designed for a future second floor. Structures were completed in 1998.
Christ's Greenfield Lutheran Church;
New building addition to the existing campus. The two-story structure has 15,000 sq. ft. of classroom and administration space and a 3,300 sq. ft. theatre/performing arts space. Completed in 1998.
Borgade Catholic High School;
Completed in 1999, the 13,000 sq. ft. Multipurpose addition to the existing Gym houses new locker rooms, wrestling room and storage.
Xavier College Prepatory; Located in Phoenix the new Virginia Piper Center was completed in 1993. The two story Structure has 19,000 sq. ft. and houses the Science, Mathematics and Computer Classes.
Seton Catholic High School;
A new 28,000 sq. ft. Gym with attached classrooms was completed in 1994. The campus is located in Chandler, AZ.
St. Mary's High School;
Located in Phoenix, A three-story Classroom building was completed in 2001. The structure has two stories above grade one below. Within the structure is a two-story space Performing Arts Center. The structure is approximately 28,000 sq. ft..
Christ Church of the Ascension;
A two-story Classroom Building with approximately 25,000 sq. ft. and an attached 2,000 sq. ft. Chapel was completed in 2002. Located in Paradise Valley, AZ.
St. Thomas Aquinas Elementary School;
A New Campus with a two-story Classroom Structure of approximately 22,000 sq. ft.. Located in Avondale, the structure is design for Future Expansion. Project completed in 2002.
Desert Hills Presbyterian Church;
Located in Scottsdale, a new two-story 18,000 sq. ft. Multipurpose/Classroom building was completed in 2006.
St. John Bosco Inter-parish School;
A new Elementary School Campus consisting of several structures and a total square footage of approximately 44,000 sq. ft.. Original project completed in 2000. Structures were designed for Future expansion, and in 2009, approximately 6,000 sq. ft. of new classrooms were added as planned.
Christ Church of the Valley;
A new 7,000 sq. ft. Youth Classroom building was completed in 2000.
Chicanos Por La Casa;
A new Head Start Education Building was constructed in Yuma, AZ and completed in 2008. The Structure is approximately 5,000 sq. ft.
|